Skip to content

Conversation

artivis
Copy link
Contributor

@artivis artivis commented Nov 26, 2020

This PR sets the paths to find git-core in the snap packaging. It fixes the issue to migrate repository from e.g. Github:

Migrate repository from https://github.com/artivis/some-repo.git failed: Clone: exit status 128 - warning: templates not found /usr/share/git-core/templates
fatal: Unable to find remote helper for 'https'

Successfully tested locally.

Closes #12388

@artivis
Copy link
Contributor Author

artivis commented Nov 26, 2020

@popey FYI.

@GiteaBot GiteaBot added the lgtm/need 2 This PR needs two approvals by maintainers to be considered for merging. label Nov 26, 2020
@lunny lunny added the topic/distribution This PR changes something about the packaging of Gitea label Nov 26, 2020
@silverwind
Copy link
Member

Are these paths guaranteed to exit?

@artivis
Copy link
Contributor Author

artivis commented Nov 27, 2020

Are these paths guaranteed to exit?

Yes, /usr/{lib,share}/git-core are the default paths and $SNAP is snapcraft root prefix path. Note that the default paths (without the prefix) do not exist hence the issue.

@GiteaBot GiteaBot added lgtm/need 1 This PR needs approval from one additional maintainer to be merged. and removed lgtm/need 2 This PR needs two approvals by maintainers to be considered for merging. labels Nov 27, 2020
@lafriks lafriks added this to the 1.14.0 milestone Nov 27, 2020
@GiteaBot GiteaBot added lgtm/done This PR has enough approvals to get merged. There are no important open reservations anymore. and removed lgtm/need 1 This PR needs approval from one additional maintainer to be merged. labels Nov 30, 2020
@techknowlogick techknowlogick merged commit 870fd53 into go-gitea:master Nov 30, 2020
@artivis artivis deleted the fix/snap-git-core branch December 1, 2020 00:36
techknowlogick added a commit to techknowlogick/gitea that referenced this pull request Dec 2, 2020
Signed-off-by: artivis <[email protected]>

Co-authored-by: techknowlogick <[email protected]>
@techknowlogick techknowlogick added the backport/done All backports for this PR have been created label Dec 2, 2020
techknowlogick added a commit that referenced this pull request Dec 2, 2020
Signed-off-by: artivis <[email protected]>

Co-authored-by: techknowlogick <[email protected]>

Co-authored-by: Jeremie Deray <[email protected]>
@go-gitea go-gitea locked and limited conversation to collaborators Jan 18, 2021
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
backport/done All backports for this PR have been created lgtm/done This PR has enough approvals to get merged. There are no important open reservations anymore. topic/distribution This PR changes something about the packaging of Gitea
Projects
None yet
Development

Successfully merging this pull request may close these issues.

Snap-package broken MySQL TLS, HTTPS repo-migration
6 participants