-
Notifications
You must be signed in to change notification settings - Fork 13
Closed
Labels
Milestone
Description
The following task list outlines the milestones required to complete the passive F3 testing on mainnet.
See F3 Mainnet Passive Test Plan for more details.
- Testing utilities for passive testing in network deployment #229
- Comprehensive Simulation Testing #226
- Monitoring Infrastructure Setup #227
- Local Testnet Deployment #228
- Calibnet Deployment: Deploy the F3 protocol on Calibnet to mimic the conditions and processes of a mainnet rollout.
- Post-Calibnet Deployment Metrics Analysis: Analyze the collected metrics for performance and correctness indicators. Confirm that all systems function as expected based on the metrics.
- Potential Pre-mainnet F3 Implementation Adjustments: Based on insights from the Calibnet deployment, make any necessary adjustments. Freeze the F3 Alpha implementation in preparation for mainnet deployment.
- Mainnet Deployment: Roll out the optimized F3 implementation across the mainnet. Follow a phased approach to monitor performance and impact during the rollout.
- Post-Mainnet Deployment Metrics Analysis: Continuously monitor the F3 metrics post-mainnet deployment. Assess performance, correctness, and uptake to determine if further adjustments are needed.
Metadata
Metadata
Assignees
Labels
Type
Projects
Status
Done