Skip to content

Pull requests: pingcap/tidb

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

bazel: enable CGO_ENABLE when to build binary component/dumpling This is related to Dumpling of TiDB. do-not-merge/needs-linked-issue needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#65062 opened Dec 16, 2025 by hawkingrei Loading…
1 of 13 tasks
planner: Apply should not be full scan when plan cache enabled (#64646) approved do-not-merge/cherry-pick-not-approved do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#65061 opened Dec 16, 2025 by ti-chi-bot Loading…
1 of 13 tasks
fix bug file-not-found error for gcs approved do-not-merge/invalid-title do-not-merge/needs-linked-issue needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#65058 opened Dec 16, 2025 by JoyC-dev Loading…
1 of 13 tasks
column: set correct flen and decimal for softdelete column needs-1-more-lgtm Indicates a PR needs 1 more LGTM. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#65057 opened Dec 16, 2025 by xhebox Loading…
13 tasks
fix: CGO_ENABLED_FOR_LINT=1 for macos approved contribution This PR is from a community contributor. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#65056 opened Dec 16, 2025 by yihong0618 Loading…
1 of 13 tasks
planner: consider the new tidb_translate_softdelete_sql variable in the plan cache | tidb-test=feature/active-active tikv=feature/active-active release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#65053 opened Dec 15, 2025 by time-and-fate Loading…
1 of 13 tasks
stats: Correctly set stats version after running ANALYZE (#64443) component/statistics do-not-merge/cherry-pick-not-approved do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#65052 opened Dec 15, 2025 by ti-chi-bot Loading…
1 of 13 tasks
planner: support basic usage of partial index release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#65051 opened Dec 15, 2025 by winoros Loading…
1 of 13 tasks
ddl: sync affinity group for pd release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#65049 opened Dec 15, 2025 by lhy1024 Loading…
1 of 13 tasks
*: update pd client and client go approved lgtm needs-cherry-pick-release-8.5 Should cherry pick this PR to release-8.5 branch. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#65044 opened Dec 15, 2025 by lhy1024 Loading…
1 of 13 tasks
*: upgrade golang to 1.25.5 (#63475) approved cherry-pick-approved Cherry pick PR approved by release team. component/dumpling This is related to Dumpling of TiDB. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#65043 opened Dec 15, 2025 by ti-chi-bot Loading…
3 tasks done
memory: add global mem arbitrator metrics to nextgen grafana release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#65042 opened Dec 15, 2025 by solotzg Loading…
1 of 13 tasks
store/copr: add defensive measures for bucket boundary bug release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#65041 opened Dec 15, 2025 by ekexium Loading…
1 of 13 tasks
dxf: add concurrency/max-node/duration to the final metering data to help estimate cost approved lgtm release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#65039 opened Dec 15, 2025 by D3Hunter Loading…
2 of 13 tasks
meta: fix infoschema compare foreign key field is null to decide whether it must load (#60235) approved cherry-pick-approved Cherry pick PR approved by release team. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#65037 opened Dec 15, 2025 by ti-chi-bot Loading…
1 of 13 tasks
*: support system variable tidb_index_lookup_pushdown_policy and hint NO_INDEX_LOOKUP_PUSHDOWN (#64932) do-not-merge/cherry-pick-not-approved do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#65035 opened Dec 15, 2025 by ti-chi-bot Loading…
1 of 13 tasks
planner: discourage TableReader when concurrency isnt warranted release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#65029 opened Dec 15, 2025 by terry1purcell Loading…
1 of 13 tasks
planner: prefix index may lose to FullTableScan code fix release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#65026 opened Dec 15, 2025 by terry1purcell Loading…
1 of 13 tasks
planner: prefix index may lose to FullTableScan do-not-merge/needs-linked-issue release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#65024 opened Dec 14, 2025 by terry1purcell Loading…
1 of 13 tasks
executor: flaky test TestSplitTablesQueryMatch ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#65022 opened Dec 13, 2025 by terry1purcell Loading…
1 of 13 tasks
[DNM] debug: release 8.5 debug integration test checksum mismatch do-not-merge/cherry-pick-not-approved do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#65021 opened Dec 13, 2025 by Leavrth Loading…
13 tasks
importinto: add executor for conflict conflicts step approved lgtm release-note-none Denotes a PR that doesn't merit a release note. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#65019 opened Dec 13, 2025 by D3Hunter Loading…
1 of 13 tasks
planner: flaky test in stats test component/statistics do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#65014 opened Dec 12, 2025 by terry1purcell Loading…
1 of 13 tasks
client-go: support fall back to leader handle when using ScanRegions/BatchScanRegions (#64934) cherry-pick-approved Cherry pick PR approved by release team. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#65009 opened Dec 12, 2025 by ti-chi-bot Loading…
1 of 13 tasks
expression: support newer UUID types component/expression ok-to-test Indicates a PR is ready to be tested. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#65007 opened Dec 12, 2025 by dveeden Loading…
6 of 18 tasks
ProTip! Mix and match filters to narrow down what you’re looking for.