Skip to content

Conversation

@drbergman
Copy link
Collaborator

for a brief second, studio was parsing cycle durations into rates and back, truncating to 5 decimals at each step. studio no longer double-converts cycle durations.
the template project was updated to 1.14.1 in this window and the cycle durations go weird decimals. This restores them

for a brief second, studio was parsing cycle durations into rates and back, truncating to 5 decimals at each step.
studio no longer double-converts cycle durations.
the template project was updated to 1.14.1 in this window and the cycle durations go weird decimals.
This restores them
@drbergman drbergman assigned drbergman and rheiland and unassigned drbergman Jan 14, 2025
@rheiland
Copy link
Collaborator

Good catch! PR looks good and should hopefully pass tests once #345 is merged.

@MathCancer MathCancer merged commit d81b4f5 into MathCancer:development Jan 20, 2025
96 of 104 checks passed
@drbergman drbergman deleted the reround-sample-project-cycle-durations branch January 21, 2025 00:22
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants